S Loop 289 reopens after pavement repairs

Traffic alert
Traffic alert(B137 / Wikipedia / CC BY-SA 4.0)
Published: Sep. 19, 2022 at 8:21 AM CDT|Updated: Sep. 19, 2022 at 9:32 AM CDT
Email This Link
Share on Pinterest
Share on LinkedIn

LUBBOCK, Texas (KCBD) - The Texas Department of Transportation closed off a portion of S Loop 289 for pavement repairs, according to a release. The roadways are not reopened.

The construction began at 9 a.m. today and lasted about 30 minutes.

Eastbound and southbound lanes at the Slide Road bridge were briefly closed.

Traffic on the Loop was diverted onto the Frontage Road at the Slide Road exit.

Motorists were asked to take alternate routes or allot extra travel time.